Jira Metrics

Overview

How the team is doing and where AI is showing up.

? Help
Period
Scope
Filters

Right now · Last 30d

Issues done

162

33.1%

AI participation

23.5%

9.5%

Lead Time (active)

10.9d

42.4%

Cycle Time (active)

5.5d

11.8%

Time to Ready p50

1.2d

73.9%

WIP active

105

19.3%

WIP blocked

37

2.8%

Deploys / week

0.5

91.4%

Bug rate / week

6.3

65.8%

Trend · last 8 weeks

Throughput

AI %

Cycle Time (active, h)

AI impact

MetricAI medianHuman medianΔ%
Cycle Time (active)AI: 6dn=34Human: 5.1dn=123 17.7%
Lead Time (active)AI: 6dn=38Human: 13.6dn=124 55.7%
Time to Ready p50AI: 0.1hn=34Human: 3.9dn=124 99.9%
PRs mergedAI: 0Human: 48
PR review p50AI: n=0Human: 3.3dn=14⚠ n<20

Before vs After AI

MetricBefore AIAfter AIΔ
Lead time p50 (raw, days)19.2dn=24058.6dn=694 55.4%
Throughput / week12.5n=240514n=694 12.4%
AI participation (%)0n=240517.2n=694
Deploys / week0.2n=91.3n=65
Change failure rate (%)18.2n=1120.7n=82
Per-project breakdown (2 projects)
ADSAdvertisementsplit: 2025-08-01
mode: compare
Before AI55 weeks · n=193
Lead Time (raw)
23d
Throughput / wk
3.5
AI %
0%
Deploys / wk
0.2
Change fail rate
18.2%
Deployments
11
After AI50 weeks · n=379
Lead Time (raw)
6.8d
Throughput / wk
7.5
AI %
5.5%
Deploys / wk
1.3
Change fail rate
20.7%
Deployments
82
EVOPlatforms Evolutionsplit: 2026-04-02
mode: compare
Before AI103 weeks · n=2212
Lead Time (raw)
15.3d
Throughput / wk
21.4
AI %
0%
Deploys / wk
Change fail rate
Deployments
0
After AI15 weeks · n=315
Lead Time (raw)
10.3d
Throughput / wk
20.5
AI %
28.9%
Deploys / wk
Change fail rate
Deployments
0

Tip: switch any project to Before only / After only in its config to focus on one era — useful when one side has insufficient data or contaminated history.

Top teams · by throughput

AI activity · how agents are being used

AgentAssignedAuthored PRsReportedTransitionsComments
Oliver10413127259
Veronica (ADOMCPAutomation)28014138108
Nikolaos0000187
Amelia00000
Anastasia00000
Sakura00000
Robocop00000
Total38427265554

Data Quality

CheckStatusCurrent valueWhat it means
Sync freshness5/5 projects · 5 stale > 24h · oldest ADS 257.4hHow recently we pulled JIRA data. Stale > 24h means the numbers in this scope may be lagging real-world state.
Latest sync status5/5 projects last sync OKWhether each project's most recentsync succeeded. This is the current-health signal: if green, every project's data is fresh from a successful pull, even if older runs in the 24h window failed.
Historical errors (last 24h)0Count of failed sync attempts in the last 24h. Transient noise unless Latest sync status above is also red — then a project is currently broken, not just blipped.
Metric configsall projects fully configuredEach project has 11 metric definitions (start/end statuses, ready statuses, etc.). All projects fully configured means cycle/lead/WIP/throughput/etc. use the project-specific status lists, not fallback defaults.
AI Period coverage2/5 projects configuredNumber of projects where someone clicked 'Compare' on the project's config page and set an AI introduction date. Drives the 'Before vs After AI' section below. Most projects can stay unconfigured — only opt in for projects where you actually want a before/after split.
Stage config coverage1 status missing from 1 project' configs · 0 wip configs missing pauseStatusesConfigs must list every status the team actually uses. Otherwise Where Work Waits and Blocked WIP silently drop transitions. Audit17 P0-3.
PR ↔ JIRA linkage (last 30d)ADS 58.8% (20/34)TDOT 85.7% (12/14)Share of completed PRs whose branch name or title contains a JIRA issue key (e.g. ADS-1234). Below 60% means the PR/JIRA join is unreliable for that project — for those, quote PR-only metrics (PR Throughput, Review Duration) instead of metrics that join PRs back to JIRA tickets.

Where work waits

Bottleneck: tickets spend the most time in Waiting for Client (16.2d median). This is the top of Active Flow Bottlenecks, not the intake card.

Active Flow Bottlenecks

Workflow stageRelative wait timeMedian time
Waiting for Client
16.2dp50
Ready For Staging
3.5dp50
Ready For Canary
1.4dp50
On Hold
1.2dp50
Ready For Review
17.7hp50
Failed On Testing
17.7hp50

Backlog / Intake Aging

Workflow stageRelative wait timeMedian time
Approved
120.4dp50
Open
58.9dp50
New
41.5dp50
Approved for Sprint
17.3dp50
To Do
13.5dp50
Triaged
12.1dp50

Longest stuck right now

KeySummaryStatusAge
EVO-176[ Q2 | 2026] Localisation - Technical Analysis (Game Page + Generic Pages)In Progress830.9d
ADS-195Ad-Shield: Ad-blocker mitigation [adshield]In Progress397.5d
ADS-297Evaluate dynamic flooring performanceIn Progress354.9d
ADS-141GAM OptimisationsIn Progress348.9d
ADS-316WaPo Ad OptimisationsIn Progress348.8d
ADS-305Opti Digital - Dynamic flooring solution - TRIALIn Progress334.8d
ADS-269[Aditude] Dynamic Price FlooringIn Progress332d
EVO-3212[Q1 | 2026] On Call Issues - Sentry / Grafana In Progress326.8d
19 tickets excluded — managed centrally.
133 tickets excluded — managed centrally.