Jira Metrics

Overview

How the team is doing and where AI is showing up.

? Help
Period
Scope
Filters

Right now · Last 30d

Issues done

257

24.9%

AI participation

15.2%

5.3%

Lead Time (active)

8.2d

47.7%

Cycle Time (active)

4.5d

14.0%

Time to Ready p50

1.3d

73.5%

WIP active

308

12.4%

WIP blocked

86

2.4%

Deploys / week

0.5

94.4%

Bug rate / week

15.2

48.3%

Trend · last 8 weeks

Throughput

AI %

Cycle Time (active, h)

AI impact

MetricAI medianHuman medianΔ%
Cycle Time (active)AI: 6dn=35Human: 3.9dn=199 54.4%
Lead Time (active)AI: 6dn=39Human: 10dn=218 39.5%
Time to Ready p50AI: 0.1hn=35Human: 3.9dn=169 99.9%
PRs mergedAI: 0Human: 48
PR review p50AI: n=0Human: 3.3dn=14⚠ n<20

Before vs After AI

MetricBefore AIAfter AIΔ
Lead time p50 (raw, days)15.3dn=416410.3dn=857 33.0%
Throughput / week15n=416412.7n=857 15.4%
AI participation (%)0n=416411.9n=857
Deploys / week0.2n=91.3n=65
Change failure rate (%)18.2n=1120.7n=82
Per-project breakdown (3 projects)
ADSAdvertisementsplit: 2025-08-01
mode: compare
Before AI55 weeks · n=193
Lead Time (raw)
23d
Throughput / wk
3.5
AI %
0%
Deploys / wk
0.2
Change fail rate
18.2%
Deployments
11
After AI50 weeks · n=379
Lead Time (raw)
6.8d
Throughput / wk
7.5
AI %
5.5%
Deploys / wk
1.3
Change fail rate
20.7%
Deployments
82
EVOPlatforms Evolutionsplit: 2026-04-02
mode: compare
Before AI103 weeks · n=2212
Lead Time (raw)
15.3d
Throughput / wk
21.4
AI %
0%
Deploys / wk
Change fail rate
Deployments
0
After AI16 weeks · n=315
Lead Time (raw)
10.3d
Throughput / wk
20.3
AI %
28.9%
Deploys / wk
Change fail rate
Deployments
0
PDOPlatform Daily Operationssplit: 2026-03-30
mode: compare
Before AI88 weeks · n=1759
Lead Time (raw)
6d
Throughput / wk
20
AI %
0%
Deploys / wk
Change fail rate
Deployments
0
After AI16 weeks · n=163
Lead Time (raw)
28.1d
Throughput / wk
10.2
AI %
1.2%
Deploys / wk
Change fail rate
Deployments
0

Tip: switch any project to Before only / After only in its config to focus on one era — useful when one side has insufficient data or contaminated history.

Top teams · by throughput

AI activity · how agents are being used

AgentAssignedAuthored PRsReportedTransitionsComments
Oliver11413127259
Veronica (ADOMCPAutomation)28012128101
Nikolaos0000182
Amelia00000
Anastasia00000
Sakura00000
Robocop00000
Total39425255542

Data Quality

CheckStatusCurrent valueWhat it means
Sync freshness8/8 projects · 8 stale > 24h · oldest ADS 281.8hHow recently we pulled JIRA data. Stale > 24h means the numbers in this scope may be lagging real-world state.
Latest sync status8/8 projects last sync OKWhether each project's most recentsync succeeded. This is the current-health signal: if green, every project's data is fresh from a successful pull, even if older runs in the 24h window failed.
Historical errors (last 24h)0Count of failed sync attempts in the last 24h. Transient noise unless Latest sync status above is also red — then a project is currently broken, not just blipped.
Metric configsall projects fully configuredEach project has 11 metric definitions (start/end statuses, ready statuses, etc.). All projects fully configured means cycle/lead/WIP/throughput/etc. use the project-specific status lists, not fallback defaults.
AI Period coverage3/8 projects configuredNumber of projects where someone clicked 'Compare' on the project's config page and set an AI introduction date. Drives the 'Before vs After AI' section below. Most projects can stay unconfigured — only opt in for projects where you actually want a before/after split.
Stage config coverage1 status missing from 1 project' configs · 0 wip configs missing pauseStatusesConfigs must list every status the team actually uses. Otherwise Where Work Waits and Blocked WIP silently drop transitions. Audit17 P0-3.
PR ↔ JIRA linkage (last 30d)ADS 58.8% (20/34)TDOT 85.7% (12/14)Share of completed PRs whose branch name or title contains a JIRA issue key (e.g. ADS-1234). Below 60% means the PR/JIRA join is unreliable for that project — for those, quote PR-only metrics (PR Throughput, Review Duration) instead of metrics that join PRs back to JIRA tickets.

Where work waits

Bottleneck: tickets spend the most time in Waiting for Client (50.1d median). This is the top of Active Flow Bottlenecks, not the intake card.

Active Flow Bottlenecks

Workflow stageRelative wait timeMedian time
Waiting for Client
50.1dp50
Ready For Review
17.6dp50
On Hold
16.1dp50
Ready For Live
14dp50
Failed On Testing
6.1dp50
Ready To Test
2.6dp50

Backlog / Intake Aging

Workflow stageRelative wait timeMedian time
Ready
574dp50
New
94.9dp50
Open
59.4dp50
Approved
36.7dp50
To Do
13.5dp50
Triaged
12.1dp50

Longest stuck right now

KeySummaryStatusAge
EVO-176[ Q2 | 2026] Localisation - Technical Analysis (Game Page + Generic Pages)In Progress831.9d
TECH-68[Server-to-Server payment notification] add api for reading failed transaction list Ready For Live751.9d
TECH-171Authentication process in Nakama will now fetch gem count from Eagle on user creationReady To Test731.7d
TECH-186[Dual Sync Approach] Eagle side synchronizationReady For Live726.9d
PU-1698 Ball Pool Together - launch stand-alone 8 ball Pool TogetherIn Progress726.9d
PU-126Premier Sunday Crossword - Solve source of puzzle feedsReady For Live726.9d
PU-177Crosswords - high priority maintenance and improvementsIn Progress726.9d
PU-81AARP all games - adaptive samplingReady For Review726.9d
19 tickets excluded — managed centrally.
133 tickets excluded — managed centrally.