Jira Metrics

Overview

How the team is doing and where AI is showing up.

? Help
Period
Scope
Filters

Right now · Last 30d

Issues done

75

47.2%

AI participation

36.0%

17.0%

Lead Time (active)

26d

42.3%

Cycle Time (active)

6.7d

10.3%

Time to Ready p50

13.7d

98.3%

WIP active

42

16.7%

WIP blocked

5

· 0.0%

Deploys / week

0.0

Bug rate / week

2.6

57.4%

Trend · last 8 weeks

Throughput

AI %

Cycle Time (active, h)

AI impact

MetricAI medianHuman medianΔ%
Cycle Time (active)AI: 6.1dn=23Human: 7dn=48 12.0%
Lead Time (active)AI: 7dn=27Human: 33.5dn=48 79.0%
Time to Ready p50AI: 1.8dn=23Human: 16.9dn=48 89.4%
PRs mergedAI: 0Human: 0
PR review p50AI: n=0Human: n=0⚠ n<20

Before vs After AI

MetricBefore AIAfter AIΔ
Lead time p50 (raw, days)15.3dn=221210.3dn=315 33.0%
Throughput / week21.4n=221220.4n=315 4.7%
AI participation (%)0n=221228.9n=315
Deploys / weekn=0n=0
Change failure rate (%)n=0n=0
Per-project breakdown (1 project)
EVOPlatforms Evolutionsplit: 2026-04-02
mode: compare
Before AI103 weeks · n=2212
Lead Time (raw)
15.3d
Throughput / wk
21.4
AI %
0%
Deploys / wk
Change fail rate
Deployments
0
After AI15 weeks · n=315
Lead Time (raw)
10.3d
Throughput / wk
20.4
AI %
28.9%
Deploys / wk
Change fail rate
Deployments
0

Tip: switch any project to Before only / After only in its config to focus on one era — useful when one side has insufficient data or contaminated history.

Top teams · by throughput

KeyTeamResolved · 30dIssuesAI doneAI %

AI activity · how agents are being used

AgentAssignedAuthored PRsReportedTransitionsComments
Veronica (ADOMCPAutomation)27012128101
Oliver00000
Amelia00000
Anastasia00000
Sakura00000
Nikolaos00000
Robocop00000
Total27012128101

Data Quality

CheckStatusCurrent valueWhat it means
Sync freshness1/1 projects · 1 stale > 24h · oldest EVO 265.7hHow recently we pulled JIRA data. Stale > 24h means the numbers in this scope may be lagging real-world state.
Latest sync status1/1 projects last sync OKWhether each project's most recentsync succeeded. This is the current-health signal: if green, every project's data is fresh from a successful pull, even if older runs in the 24h window failed.
Historical errors (last 24h)0Count of failed sync attempts in the last 24h. Transient noise unless Latest sync status above is also red — then a project is currently broken, not just blipped.
Metric configsall projects fully configuredEach project has 11 metric definitions (start/end statuses, ready statuses, etc.). All projects fully configured means cycle/lead/WIP/throughput/etc. use the project-specific status lists, not fallback defaults.
AI Period coverage1/1 projects configuredNumber of projects where someone clicked 'Compare' on the project's config page and set an AI introduction date. Drives the 'Before vs After AI' section below. Most projects can stay unconfigured — only opt in for projects where you actually want a before/after split.
Stage config coverageall observed statuses configured · all wip configs include pause statusesConfigs must list every status the team actually uses. Otherwise Where Work Waits and Blocked WIP silently drop transitions. Audit17 P0-3.
PR ↔ JIRA linkage (last 30d)no completed PRs in 30dShare of completed PRs whose branch name or title contains a JIRA issue key (e.g. ADS-1234). Below 60% means the PR/JIRA join is unreliable for that project — for those, quote PR-only metrics (PR Throughput, Review Duration) instead of metrics that join PRs back to JIRA tickets.

Where work waits

Bottleneck: tickets spend the most time in Waiting for Client (16.2d median). This is the top of Active Flow Bottlenecks, not the intake card.

Active Flow Bottlenecks

Workflow stageRelative wait timeMedian time
Waiting for Client
16.2dp50
On Hold
16.1dp50
Ready For Staging
3.5dp50
Ready To Merge
20.9hp50
Ready For Canary
20.1hp50
Ready For Review
18.2hp50

Backlog / Intake Aging

Workflow stageRelative wait timeMedian time
Approved
204.2dp50
Backlog
43.9dp50
New
41.5dp50
To Do
14.1dp50
Selected for Development
0.2hp50

Longest stuck right now

KeySummaryStatusAge
EVO-176[ Q2 | 2026] Localisation - Technical Analysis (Game Page + Generic Pages)In Progress831.3d
EVO-3212[Q1 | 2026] On Call Issues - Sentry / Grafana In Progress327.2d
EVO-3739[Q1 | 26] New Shop Express Checkout OptionsIn Progress185d
EVO-3438[Unit-Tests] Cover missing important areasIn Progress178d
EVO-3807[2026] MSFT Trivia ArenaIn Progress122.8d
EVO-3875[2026] Bugs - UIIn Progress122.8d
EVO-3873[2026] Microsoft bugsIn Progress122.8d
EVO-3857[2026] Bugs - DataIn Progress122.8d
133 tickets excluded — managed centrally.