Jira Metrics

Overview

How the team is doing and where AI is showing up.

? Help
Period
Scope
Filters

Right now · Last 30d

Issues done

3

AI participation

0.0%

· 0.0%

Lead Time (active)

69.1d

Cycle Time (active)

31.7d

Time to Ready p50

0.5h

WIP active

3

· 0.0%

WIP blocked

0

Deploys / week

0.0

Bug rate / week

1.4

16.7%

Trend · last 8 weeks

Throughput

AI %

Cycle Time (active, h)

AI impact

MetricAI medianHuman medianΔ%
Cycle Time (active)AI: n=0Human: 31.7dn=2⚠ n<20
Lead Time (active)AI: n=0Human: 69.1dn=3⚠ n<20
Time to Ready p50AI: n=0Human: 0.5hn=3⚠ n<20
PRs mergedAI: 0Human: 0
PR review p50AI: n=0Human: n=0⚠ n<20

AI Period Comparison

Not configured for any project in this scope. To compare Before vs After AI, configure an intro_date and modeper project on the project's Configuration page.

Top teams · by throughput

KeyTeamResolved · 30dIssuesAI doneAI %

AI activity · how agents are being used

AgentAssignedAuthored PRsReportedTransitionsComments
Oliver003190
Amelia00000
Anastasia00000
Sakura00000
Nikolaos00000
Veronica (ADOMCPAutomation)00000
Robocop00000
Total003190

Data Quality

CheckStatusCurrent valueWhat it means
Sync freshness1/1 projects · 1 stale > 24h · oldest IMC 298.8hHow recently we pulled JIRA data. Stale > 24h means the numbers in this scope may be lagging real-world state.
Latest sync status1/1 projects last sync OKWhether each project's most recentsync succeeded. This is the current-health signal: if green, every project's data is fresh from a successful pull, even if older runs in the 24h window failed.
Historical errors (last 24h)0Count of failed sync attempts in the last 24h. Transient noise unless Latest sync status above is also red — then a project is currently broken, not just blipped.
Metric configsall projects fully configuredEach project has 11 metric definitions (start/end statuses, ready statuses, etc.). All projects fully configured means cycle/lead/WIP/throughput/etc. use the project-specific status lists, not fallback defaults.
AI Period coverage0/1 projects configuredNumber of projects where someone clicked 'Compare' on the project's config page and set an AI introduction date. Drives the 'Before vs After AI' section below. Most projects can stay unconfigured — only opt in for projects where you actually want a before/after split.
Stage config coverage1 status missing from 1 project' configs · 0 wip configs missing pauseStatusesConfigs must list every status the team actually uses. Otherwise Where Work Waits and Blocked WIP silently drop transitions. Audit17 P0-3.
PR ↔ JIRA linkage (last 30d)no completed PRs in 30dShare of completed PRs whose branch name or title contains a JIRA issue key (e.g. ADS-1234). Below 60% means the PR/JIRA join is unreliable for that project — for those, quote PR-only metrics (PR Throughput, Review Duration) instead of metrics that join PRs back to JIRA tickets.

Where work waits

Bottleneck: tickets spend the most time in In Progress (60.5d median). This is the top of Active Flow Bottlenecks, not the intake card.

Active Flow Bottlenecks

Workflow stageRelative wait timeMedian time
In Progress
60.5dp50

Backlog / Intake Aging

Workflow stageRelative wait timeMedian time
Triaged
12.1dp50

Longest stuck right now

KeySummaryStatusAge
IMC-54Word Wipe 2: Power Play - "Continue" button returns to "Time’s Up" pop-upIn Progress122.4d
IMC-62Ads refresh cause gameplay freezesIn Progress76.3d
IMC-64Outspell - Dictionary Contains Vulgar Spanish WordsIn Progress60.5d