Jira Metrics

Overview

How the team is doing and where AI is showing up.

? Help
Period
Scope
Filters

Right now · Last 30d

Issues done

14

62.2%

AI participation

7.1%

4.4%

Lead Time (active)

19.4d

5.7%

Cycle Time (active)

7.7d

93.0%

Time to Ready p50

20.8d

12.7%

WIP active

15

15.4%

WIP blocked

6

· 0.0%

Deploys / week

0.0

Bug rate / week

0.0

100.0%

Trend · last 8 weeks

Throughput

AI %

Cycle Time (active, h)

AI impact

MetricAI medianHuman medianΔ%
Cycle Time (active)AI: 41.1dn=1Human: 7.5dn=13⚠ n<20
Lead Time (active)AI: 41.1dn=1Human: 18dn=13⚠ n<20
Time to Ready p50AI: 1.8hn=1Human: 20.8dn=12⚠ n<20
PRs mergedAI: 0Human: 0
PR review p50AI: n=0Human: n=0⚠ n<20

Before vs After AI

MetricBefore AIAfter AIΔ
Lead time p50 (raw, days)6dn=175928.1dn=163 367.2%
Throughput / week20n=175910.1n=163 49.5%
AI participation (%)0n=17591.2n=163
Deploys / weekn=0n=0
Change failure rate (%)n=0n=0
Per-project breakdown (1 project)
PDOPlatform Daily Operationssplit: 2026-03-30
mode: compare
Before AI88 weeks · n=1759
Lead Time (raw)
6d
Throughput / wk
20
AI %
0%
Deploys / wk
Change fail rate
Deployments
0
After AI16 weeks · n=163
Lead Time (raw)
28.1d
Throughput / wk
10.1
AI %
1.2%
Deploys / wk
Change fail rate
Deployments
0

Tip: switch any project to Before only / After only in its config to focus on one era — useful when one side has insufficient data or contaminated history.

Top teams · by throughput

KeyTeamResolved · 30dIssuesAI doneAI %

AI activity · how agents are being used

AgentAssignedAuthored PRsReportedTransitionsComments
Oliver10000
Amelia00000
Anastasia00000
Sakura00000
Nikolaos00000
Veronica (ADOMCPAutomation)00000
Robocop00000
Total10000

Comments will populate as projects re-sync with the new comments fetch.

Data Quality

CheckStatusCurrent valueWhat it means
Sync freshness1/1 projects · 1 stale > 24h · oldest PDO 298.8hHow recently we pulled JIRA data. Stale > 24h means the numbers in this scope may be lagging real-world state.
Latest sync status1/1 projects last sync OKWhether each project's most recentsync succeeded. This is the current-health signal: if green, every project's data is fresh from a successful pull, even if older runs in the 24h window failed.
Historical errors (last 24h)0Count of failed sync attempts in the last 24h. Transient noise unless Latest sync status above is also red — then a project is currently broken, not just blipped.
Metric configsall projects fully configuredEach project has 11 metric definitions (start/end statuses, ready statuses, etc.). All projects fully configured means cycle/lead/WIP/throughput/etc. use the project-specific status lists, not fallback defaults.
AI Period coverage1/1 projects configuredNumber of projects where someone clicked 'Compare' on the project's config page and set an AI introduction date. Drives the 'Before vs After AI' section below. Most projects can stay unconfigured — only opt in for projects where you actually want a before/after split.
Stage config coverageall observed statuses configured · all wip configs include pause statusesConfigs must list every status the team actually uses. Otherwise Where Work Waits and Blocked WIP silently drop transitions. Audit17 P0-3.
PR ↔ JIRA linkage (last 30d)no completed PRs in 30dShare of completed PRs whose branch name or title contains a JIRA issue key (e.g. ADS-1234). Below 60% means the PR/JIRA join is unreliable for that project — for those, quote PR-only metrics (PR Throughput, Review Duration) instead of metrics that join PRs back to JIRA tickets.

Where work waits

Bottleneck: tickets spend the most time in Ready For Review (33.9d median). This is the top of Active Flow Bottlenecks, not the intake card.

Active Flow Bottlenecks

Workflow stageRelative wait timeMedian time
Ready For Review
33.9dp50
On Hold
20.1dp50
In Testing
15.1dp50
Ready For Live
14dp50
Failed On Testing
10.8dp50
Ready To Test
4.8dp50

Backlog / Intake Aging

Workflow stageRelative wait timeMedian time
Ready
574dp50
New
35.5dp50
To Do
16dp50
Approved
1.9dp50
Approved for Sprint
0hp50

Longest stuck right now

KeySummaryStatusAge
PDO-3570[Q3 and Q4 | 2025] Localization Batch 3In Progress238.6d
PDO-3644GameAPI optimizationIn Progress238.6d
PDO-3882Experiment - Move the Current Syndication to a Single-domain SolutionIn Progress167.2d
PDO-4053Migrate Cypress Tests to new Playwright frameworkIn Progress83.6d
PDO-4005[Syndication 2.0] Partner Migration - SpielaffeReady To Test67.5d
PDO-3908Transform the current Seasonal Category feature from Admin to accomodate Several CategoriesReady For Live60.5d
PDO-4097Admin Site - Meta template drop down menuFailed On Testing60.4d
PDO-3972[Q2 | 2026] Game API ticketsIn Progress56.4d