Planned vs Unplanned
Share of completed issues that were planned vs unplanned (interrupts).
7%
unplanned
39
planned
3
unplanned
Contributing tickets (42)
๐
42
| Keyโ | Summaryโ | Typeโ | Assigneeโ | Classโ | Completedโผ |
|---|---|---|---|---|---|
| ADS-1397 | Salesforce - Adding Product Field | Product Backlog Item | Semenyuk Dmitriy | Planned | 7/8/2026 |
| ADS-1347 | Architecture documentation and observability console | Product Backlog Item | Semenyuk Dmitriy | Planned | 7/8/2026 |
| ADS-1407 | Syndication 2.0 โ Fill the list, test end-to-end, get Meghan's sign-off | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1406 | Syndication 2.0 โ "Product Type" dropdown value (on hold) | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1401 | Syndication 2.0 โ Confirm the spec with Meghan (confirmed Jul 7) | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1405 | Syndication 2.0 โ Give access to the same people as Evolution | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1404 | Syndication 2.0 โ Show the section on the Contract page | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1403 | Syndication 2.0 โ Create the "Syndication 2.0" object (the section rows) | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1402 | Syndication 2.0 โ Create the product list ("List of Syndication 2.0") | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1400 | Syndication 2.0 โ Snapshot the Evolution setup (our copy reference) | Sub-task | Semenyuk Dmitriy | Planned | 7/7/2026 |
| ADS-1384 | ads-monorepo: Update shared library to surface new "house"/"off" outstream prop from Jarvis API | Product Backlog Item | Tiago Louro | Planned | 7/7/2026 |
| ADS-1382 | Rewrite ark-eye reporting backend on Bun | Task | Semenyuk Dmitriy | Planned | 7/6/2026 |
| ADS-1380 | Migrate old Metabase content into mercury + right-size mercury MariaDB (OOM fix) | Product Backlog Item | Semenyuk Dmitriy | Planned | 7/6/2026 |
| ADS-1372 | Add "house" outstream option to Jarvis API schema (rename current to "off") | Product Backlog Item | Tiago Louro | Planned | 7/6/2026 |
| ADS-1371 | Add "house" outstream option to Jarvis Admin (rename current to "off") | Product Backlog Item | Tiago Louro | Planned | 7/6/2026 |
| ADS-1307 | Write outstream package README, integration guide, and "how to add outstream to a site" runbook | Product Backlog Item | Daniil Kolesnik | Planned | 7/6/2026 |
| ADS-1302 | Extend CI/CD pipelines to include packages/outstream โ build, test, and publish | Product Backlog Item | Daniil Kolesnik | Planned | 7/6/2026 |
| ADS-1301 | Implement outstream event emission system โ ad request, bid response, impression, viewability, quartile, completion, and error events | Product Backlog Item | Daniil Kolesnik | Planned | 7/6/2026 |
| ADS-1355 | POC: Ad-stack testbed + mock server (MSW/WireMock) to verify request interception & mocking | Task | Tiago Louro | Planned | 7/3/2026 |
| ADS-1381 | ark-eye /imp: accept meta as string (matches Nullable(String) storage + eye client; string meta 400s) | Bug | Semenyuk Dmitriy | Unplanned | 7/2/2026 |
| ADS-1379 | WaPo Outstream Player | Product Backlog Item | OliverAI | Planned | 7/2/2026 |
| ADS-1374 | Fix mercury ClickHouse NATS consumer to use nats.mercury.svc (was splitting messages with legacy CH) | Bug | Semenyuk Dmitriy | Unplanned | 6/30/2026 |
| ADS-1370 | ark-eye: remove dead RabbitMQ/Mongo leftovers (CH_MIGRATION.sql, database.js, stale vars) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/30/2026 |
| ADS-1369 | ark-eye /stats: wire ClickHouse credentials to adopted infra (remove hardcoded fallbacks) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/30/2026 |
| ADS-1368 | ads-infra GitOps adoption โ declarative Helm charts + gated ADO pipeline | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/30/2026 |
| ADS-1378 | Mercury outstream-metrics โ handover documentation (architecture, schema, runbook) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/30/2026 |
| ADS-1377 | Fix ark-eye /stats: point at mercury ClickHouse + creds/key from env (remove hardcode) | Bug | Semenyuk Dmitriy | Unplanned | 6/30/2026 |
| ADS-1376 | Make mercury Metabase self-contained (own MariaDB + own ClickHouse) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/30/2026 |
| ADS-1375 | Cut over ark-eye to mercury NATS (NATS_URL -> nats.mercury.svc) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/30/2026 |
| ADS-1352 | [ads-react] Add play/pause button to the player | Product Backlog Item | Daniil Kolesnik | Planned | 6/30/2026 |
| ADS-1268 | [ads-sentry] Handle ads-aks impression failures in ads-display fallbackRender | Task | Tiago Louro | Planned | 6/30/2026 |
| ADS-1359 | Fix ark-eye crash on dropped RabbitMQ connection (unhandled publish rejection) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/29/2026 |
| ADS-1360 | Deploy NATS broker and codify it in ads-infra (Phase 0, RabbitMQ->NATS / DR-1) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/29/2026 |
| ADS-1362 | Decommission RabbitMQ (broker, ClickHouse consumer, ark-eye code, IaC) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/29/2026 |
| ADS-1358 | Repoint the Eye impression beacon from the dead host to the live ark-eye host | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/29/2026 |
| ADS-1361 | ark-eye: publish to NATS behind a TRANSPORT flag (RabbitMQ->NATS cutover) | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/29/2026 |
| ADS-1363 | Lock down ClickHouse exposure (remove public LB) + rotate leaked secrets | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/29/2026 |
| ADS-1346 | Local reference environment mirroring the production topology | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/24/2026 |
| ADS-1343 | Inventory the outstream metrics landscape and assemble a local working set | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/23/2026 |
| ADS-1344 | Verify the current state of the legacy ark-eye reporting stack | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/23/2026 |
| ADS-1345 | Replace RabbitMQ (struggles under load): benchmark candidates and select a replacement | Product Backlog Item | Semenyuk Dmitriy | Planned | 6/23/2026 |
| ADS-1357 | Add ad-build-diff multi-domain ad review stage to ads-display pipeline | Task | Semenyuk Dmitriy | Planned | 6/22/2026 |
Showing 1โ42 of 42
Page 1 of 1
19 tickets excluded โ managed centrally.